For building services providers

Record site times where they arise

Cleaners work spread out, often early, often late, often at several sites in a day. MetronHR collects the times there and works out the pay group along with them.

No credit card required · Cancel monthly

  • Clock in at the site instead of filling a timesheet in the car
  • Pay group per activity, not per person
  • Journeys between sites counted correctly as working time

In shortSince 1 January 2026, building cleaning has an industry minimum wage of 15.00 euros in wage group 1 and 18.40 euros in wage group 6. Start, end and duration have to be recorded for every employee within seven days (section 17 MiLoG). MetronHR records the time at the site, assigns it to the task and thus to the wage group, and books travel between sites as working time.

Legal position

What applies in building cleaning

Two things make this industry special: a minimum wage binding on everyone that is higher than the statutory one, and a recording duty covering every employee.

Pay group 1 from 1 January 2026
15.00 euros an hour
Pay group 6 from 1 January 2026
18.40 euros an hour
Deadline for recording
7 calendar days
Retention
2 years
  1. Industry minimum wage instead of the statutory minimum wage

    From 1 January 2026, 15.00 euros an hour applies in pay group 1 (interior and maintenance cleaning) and 18.40 euros in pay group 6 (glass and facade cleaning), uniformly nationwide.

    The rates come from the framework collective agreement of the building cleaning trade and are binding on all businesses in the industry through a statutory order under section 7 AEntG, including those not bound by collective agreement. They are above the statutory minimum wage, which is therefore irrelevant for the industry. Figures per the federal guild association's announcement of 29 December 2025.

  2. The pay group depends on the activity

    Anyone cleaning offices in the morning and facades in the afternoon works in two pay groups on one day and must be paid differently for each portion of time.

    This is the point at which time tracking that only knows a start and an end is not enough. What is needed is an assignment of time to the activity, otherwise the result is either underpayment or a flat rate that pays too much.

  3. Recording under section 17 MiLoG for everyone

    The start, end and duration of daily working time must be documented no later than seven calendar days after the working day and kept for two years.

    The basis is section 2a (1) no. 6 SchwarzArbG, which names the building cleaning trade explicitly. A breach can be punished with up to 30,000 euros under section 21 MiLoG. With scattered sites the seven-day deadline is the real bottleneck, not the retention.

  4. Journeys between sites are working time

    The journey from home to the first site is not working time. The journey from the first to the second site during the working day is.

    This follows from section 2 (1) ArbZG. For employees with no fixed place of work, the European Court of Justice judgment of 10 September 2015 (C-266/14, Tyco) even counts the journey from home to the first job site. With three sites a day the intermediate journeys quickly add up to an hour that is neither recorded nor paid.

The key duties and how they are met day to day

DutySourceWith paper or ExcelWith MetronHR
Record within 7 daysSection 17(1) MiLoGtime sheets collected once a monthclock in at the site, on the same day
Wage group by taskSection 7 AEntG, framework collective agreement of the building cleaning tradewage group estimatedtask on the entry, wage group follows from it
Journeys between sites are working timeSection 2(1) ArbZGappear on no time sheeta time type of its own, counts towards maximum working time
  • Record within 7 days

    Source
    Section 17(1) MiLoG
    With paper or Excel
    time sheets collected once a month
    With MetronHR
    clock in at the site, on the same day
  • Wage group by task

    Source
    Section 7 AEntG, framework collective agreement of the building cleaning trade
    With paper or Excel
    wage group estimated
    With MetronHR
    task on the entry, wage group follows from it
  • Journeys between sites are working time

    Source
    Section 2(1) ArbZG
    With paper or Excel
    appear on no time sheet
    With MetronHR
    a time type of its own, counts towards maximum working time

Further reading: Section 7 AEntG, framework collective agreement of the building cleaning trade · Federal guild association of the building cleaning trade, announcement of 29 December 2025 · Section 2a (1) no. 6 SchwarzArbG, section 17 (1) MiLoG, section 21 MiLoG · Section 2 (1) ArbZG, ECJ of 10 September 2015, C-266/14 (Tyco)

In detail, with examples: Working hours in building cleaning: early and late shifts, travel, pay groups

As at: November 2026. This is not legal advice; for a specific case in your business it is better to ask someone with a licence to practise.

In the business today

The timesheet is in the car

In building cleaning, working time arises at other people's addresses, often outside office hours. Getting from there to an inspection-proof record is the real effort.

  • Problem

    Times reach the office too late

    If slips are collected monthly, the seven-day deadline in section 17 MiLoG has long since expired.

  • Problem

    Site time and pay group do not match

    Without assigning the hours to the activity, the correct pay group can only be guessed, and guessing costs money in both directions.

  • Problem

    Travel time disappears entirely

    The journey between two sites appears on no timesheet, yet it is working time and counts towards maximum working time.

With MetronHR

Site, activity and time in one entry

Clocking happens in the app at the site, the activity is selected at the same time, and the pay group follows from it. Journeys between sites are recorded as their own time type.

Recorded the same dayThe deadline in section 17 MiLoG is met before anyone drives to the office.

Features for building services providers

Built for distributed teams, changing sites and varied job scopes.

  • Time

    Clock in at the site

    Time is recorded where the work happens

    Via the app with a site reference or through a terminal on the premises, with no slips and no catching up.

  • Pay

    Pay group per activity

    Two groups in one day is not a special case

    The entry carries the activity, and the rate follows from it. Maintenance cleaning and glass cleaning on the same day are settled separately.

  • Projects

    Site budget and actual hours

    The margin per site visible while the month is still running

    Every site has its calculated hour budget on file. Consumption runs along instead of only showing up in the post-calculation.

  • Employee protection

    Travel time as its own time type

    Journeys count correctly towards maximum working time

    Intermediate journeys are booked separately, count as working time and are identifiable as such in reports.

  • Overview

    Inspection-proof records for two years

    Export per person and period in seconds

    Start, end and duration per working day, corrections logged, in the form the customs financial control unit expects.

For site managers and cleaners

Two roles that rarely meet in the same room.

  • Site and area management

    Costing and reality side by side

    • The site is costed at 30 hours a month. Whether it stays that way only shows up in the invoice.
    • Target and actual per site run along, and deviations show up in the second week, not next quarter.
    See project budgets
  • Cleaners

    Start and end in two seconds

    • Fill in a slip, keep it, hand it in. And at the end of the month one is missing.
    • Clock in via the app, site and activity are preset, and your own hours account is visible at any time.
    View the mobile app

Frequently asked questions from building cleaning

What building services providers ask about the minimum wage, records and travel time.

Question not answered here? Every step is explained in the help centre.

Send us a message
Which minimum wage applies in building cleaning in 2026?

From 1 January 2026, 15.00 euros an hour in pay group 1 and 18.40 euros in pay group 6, uniformly nationwide. The rates are binding on all businesses in the industry through a statutory order under section 7 AEntG, even without collective agreement coverage.

Does the statutory minimum wage apply alongside?

It applies as a floor, but has no practical relevance here because the industry minimum wage is above it in both pay groups named.

Do we have to keep records for all employees?

Yes. The building cleaning trade is named in section 2a (1) no. 6 SchwarzArbG, so section 17 (1) MiLoG applies to every employee: start, end and duration within seven calendar days, kept for two years.

Is the journey between two sites working time?

Yes. Journeys between job sites during the working day are working time within the meaning of section 2 (1) ArbZG. The journey from home to the first site is in principle not, but for employees with no fixed place of work it is, per ECJ C-266/14.

What happens if someone works in two pay groups in one day?

Then both portions of time must be recorded separately and paid at the respective rate. MetronHR assigns the entry to the activity, and the pay group follows from it automatically.

Site times, pay groups and records in one go

Clock in at the site, assign to the activity, inspection-proof records within seven days. Try it free for 14 days.

  • No credit card required
  • Ready quickly
  • Cancel monthly
  • Full access to every feature

No credit card, cancel at any time